Seattle University
  • Calendar
  • Site Index
  • Directories
  • Contact
  • Support SU
More Options
  • Report a Problem
  • Give Us Feedback
  • Search SU
  • Where do you need to go?
    • Academic Affairs
    • Professional and Continuing Education
    • Catalog
    • Core Curriculum
    • Diversity Statement
    • Global Learning
    • Health and Personal Wellness
    • Mission and Ministry
    • Nondiscrimination Policy
    • Summer Programs
    • Visit Campus
    • Facilities Services
    • Schools and Colleges
    • Albers School of Business and Economics
    • College of Arts and Sciences
    • College of Education
    • College of Nursing
    • College of Science and Engineering
    • Matteo Ricci College
    • School of Law
    • School of Theology and Ministry
    • Departments
    • Alumni
    • Athletics
    • Bookstore
    • Conference and Event Services
    • Housing and Residence Life
    • Human Resources
    • Information Technology
    • Lemieux Library
    • Marketing Communications
    • Office of Research Services
    • Public Safety
    • Recreational Sports
    • Registrar
    • Student Financial Services
    • Online Services
    • SUOnline
    • Email
    • Angel
    • MySU

Site Map | Contact | Directory

College of Science and Engineering
  • About the College
  • Areas of Study
  • Advising
  • Transfer Students
  • Project Center
  • Outreach
  • Donate Now

Department of Electrical & Computer Engineering

  • About
  • Electrical Engineering with Computer Engineering Specialization
  • Electrical Engineering
  • Senior Design
  • Transfers
  • Student Clubs
  • Laboratory
  • ECE TV
  • Careers/Recruitment

 2010-11 ECE Electives      
PDF Download
       

  

70yearssuee-shad 

EE-Facebook 

Announcements

New Student Retreat 
An opportunity for first year and transfer students to get away for a weekend in order to meet new students, reflect on how the year is going so far, and spend time in the beautiful Pacific Northwest. Get future dates 

  

Society of Hispanic Professional Engineers 
Join SHPE and take advantage of its Career Fair.
Officers  

  

The electrical engineering program is accredited by the Engineering Accreditation Commission of ABET http://www.abet.org/  

Student Software

  • Microsoft MSDNAA  
  • e-academy.com  
  • Design Software  
  • School World  
  • Cadence Acknowledgement  

SU Campus Video

 

Best Colleges 1 

MyCampusVideo-1 

 

 

 

 
Electrical & Computer Engineering Department 
Seattle University
901 12th Ave. Bannan 209
Seattle, WA 98122-1090

TEL: 206.296.5970
FAX: 206.296.5962

  

College of Science and Engineering > Electrical & Computer Engineering > Laboratory

Signal Generator Problems/Solutions

  1.  The oscilloscope is measuring twice what the signal generator voltage output is set to.

    Solution:
    Signal Generator Model 33220A
    :
    To Select the Output  Termination
    a) Press  siggenUtil1. b) Press the Output Setup softkey.
    c) P
    ress the Load softkey to choose “High Z”.
    d) Select softkey DONE


    You must go through this procedure each time you turn on the HP 33220A.


    Signal Generator Model 33120A
    :
    To Select the Output  Termination

    a) Press Menu On. (Shift . Enter). You should see A: MOD MENU. on the display.
    b) Press the right arrow key three times. You should see D: SYS MENU on the display.
    c) Press the down arrow key once. You should see  1: OUT TERM on the display. This means output termination., which is your load resistance.
    d) Press the down arrow key again. You should see 50 OHM on the display.
    e) Press the right arrow key. You should see HIGH Z on the display.
    f) Press Enter. The instrument is now set for correct operation with high or varing impedance loads.

    You must go through this procedure each time you turn on the HP 33120A.
     
     

  2. Why does this occur? 
    The signal generator output termination is set to 50 ohm (power-up default) and in this case must be set to HIGH Z. Unfortunately for us, the engineers at Agilent who designed the signal generator assumed that most people would use it in RF applications which are generally 50-Ω loads. Thus, the default power up output termination is 50-Ω. If you wish to learn more read  Signal Generator Setup  or Principles of Signal Generators.
    siggenimp1
    Remember, every time you turn on the signal generator, you must set the output termination to HIGH-Z mode. If you fail to do this, you may accidentally produce voltages twice as high as you intend, and this may damage your chip.

     

     

     

 

     

 

 

 

CONTACT | PUBLIC SAFETY | CAREERS | RSS

Copyright 2008 - College of Science and Engineering, Seattle University.

Seattle University

College of
Science and Engineering

901 12th Ave, P.O. Box 222000
Seattle WA 98122
206.296.5500
sedean@seattleu.edu