« Back to Services

Desktop Models

 

 

Lenovo ThinkCentre M58p Eco USFF 

Apple iMac 21.5inch 

 

Processor: 

Intel Core 2 Duo E8400 Processor
(3.00GHz 1333MHz 6MBL2) 

3.06Ghz Intel Core I3

RAM: 

4GB PC3-8500 SDRAM (2 DIMMs)

4GB DDR3

Hard Drive: 

160GB, 8M Cache, 7200RPM SATA II

500GB Serial ATA

Video: 

Integrated Video GMA4500

ATI Radeon HD 4670

CD/DVD: 

CD/DVD Recordable
(with DVD Playback & Burner Software)
for XP and Vista

8x SuperDrive

Keyboard: 

Lenovo Preferred Pro USB Full Size Keyboard

Apple Keyboard

Mouse: 

Lenovo Optical Wheel Mouse - USB 400 DPI

Apple Magic Mouse

Battery: 

N/A

N/A

Monitor: 

ThinkVision  L1951p Monitor 19"
Wide Aspect Ratio  

21.5" Widescreen LCD

OS: 

Windows 7 Home Premium with
Windows XP Professional

Mac OS 10.6 Snow Leopard

Audio: 

Integrated High Definition Audio

Internal Audio

Floppy: 

Not Included

Not Included


Laptop Models

 

 

Lenovo ThinkPad T410 

MacBook Pro 13" 

 
Processor: 

Intel Core i5-520M Processor 
(2.40GHz, 3MB L3, 1066MHz FSB)

2.3Ghz Dual-core Intel I5

RAM: 

4 GB PC3-8500 DDR3 SDRAM
1067MHz SODIMM Memory (2 DIMM)

4GB DDR3

Hard Drive:

320 GB Hard Disk Drive, 7200rpm

320GB Serial ATA 5400rpm

Video: 

Intel Graphics Media Accelerator 
4500MHD with vPro

Intel HD Graphics 3000

CD/DVD: 

CD/DVD Recordable 8x Max Dual Layer,
Ultrabay Slim (Serial ATA)

8x CD/DVD Burner

Keyboard: 

Internal English Keyboard

78 Key Built-in

Mouse: 

UltraNav (TrackPoint and TouchPad)

Trackpad with scroll

Battery: 

6 cell Li-Ion Battery (2.4 Ah)

Lithium Polymer
55WHr

Monitor: 

14.1" WXGA+ TFT, w/ LED Backlight, Camera

13.3" LCD Widescreen

OS: 

Windows 7 Home Premium

Mac OS X 10.6 Snow Leopard

Audio: 

Internal Audio

Internal Audio

Floppy: 

Not Included

Not Included

Announcements

Resolved: EGRN west network outage

5/24/13 10:30am

The service outage affecting the west side of Engineering building been resolved. All wired, wireless, and telephony services are fully operational. Thank you for your patience.

Upcoming Maintenance

Planned Datacenter Maintenance

The next Planned Datacenter Maintenance will occur on Friday, May 24th from 6:00pm - midnight.

Please check here for more details.

System Status

System is Online There are no current network problems or outages.



Service Now

Please click here to login with your SU email address and password.